13.3 Maximum power dissipation of equipment

All equipment providers of a delivery network (this may be a CSP itself, or a third party that provides a delivery network) that is hosted by another third party must declare the maximum power dissipation (in W) of their equipment.

13.4 Electromagnetic compatibility (EMC)

The equipment must comply with the European Standard ETSI EN 300 386 v1.6.1 (2012-09) “Electromagnetic compatibility and Radio spectrum Matters (ERM); Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements”, with regard to the emission of electromagnetic interference and immunity to such interference.

13.5 Electrostatic discharge (ESD)

The equipment must comply with the European Standard ETSI EN 300 386 v1.6.1 (2012-09) “Electromagnetic compatibility and Radio spectrum Matters (ERM); Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements”, with regard to electrostatic discharge to humans or objects.

13.6 Resistibility to overvoltages and overcurrents

The equipment must comply with the European Standard ETSI EN 300 386 v1.6.1 (2012-09) “Electromagnetic compatibility and Radio spectrum Matters (ERM); Telecommunication network equipment; ElectroMagnetic Compatibility (EMC) requirements”, with regard to resistibility to overvoltages and overcurrents.

13.7 Uninterruptible power supply (UPS)

The UPS equipment must comply with the Technical Report ETSI TR 102 446 V1.1.1 (2005-

11) "Environmental Engineering (EE); General Requirements for UPS for use in Telecommunication Environment". Both LEMF sites have a UPS and an emergency power supply.

13.8 Safety

The Electrosuisse (SEV) standards with regard to electrical safety must be met.

13.9 Space requirements

All providers of delivery network equipment (this may be a CSP itself, or a third party providing a delivery network) that is hosted by another third party, must declare the space requirements of their equipment.