Projet 2a
Consultation 2017/22: Projets d'ordonnances pour la mise en œuvre de la nouvelle loi fédérale sur la surveillance de la correspondance par poste et télécommunication · 194 pages
Fedlex · Projet · Page 35Fedlex · Projet
Technical requirements for the handover interfaces for the execution of telecommunications surveillance
Clause Available options for Swiss Additional requirements or
ETSI TS applications specifications
103 120
V1.2.1
Active: The Task is active and can produce LI traffic.
Rejected: The Task has been explicitly denied or rejected by one or more relevant authorities.
Cancelled: The Task has been permanently cancelled
Expired: The Task date for this Document has passed, meaning that the Task has lapsed.
Deactivated: The Task has been deactivated by the PTSS (i.e. at the end of the Authorization timespan)
8.2.5 TimeSpan TimeSpan is split in 5 fields detailed
below:
StartTime is populated by the PTSS in the CREATERequest (Activation) with required Lawful Interception start date and time.
EndTime is populated by the PTSS in the UPDATERequest (Deactivation) with required Lawful Interception stop date and time.
ProvisioningTime and DeprovisioningTime fields are
populated by the CSPs, in the local copy of the LITask, respectively with the LI begin date and time and with the LI end date and time.
TerminationTime is not used.
8.2.6 TargetIdentifier Required fields:
TargetIdentifierValues
8.2.8 DeliveryDetails Required fields:
IRIorCC: This structure support the dictionary entries of the PTSSNationalRequestTypes dictionary. These fields contain references to national LI types taken from the Real-time
surveillance type list (see